Post Construction Cleaning in Nairobi

New builds and renovations leave cement film, fine dust, paint splashes, silicone smears and stickers on every surface. Smartchems clears it all — floors, glass, fittings, ceilings and balconies — so your property is genuinely move-in ready and ready to hand over.

Request a free quote

What we provide

  • Cement, grout haze and tile film removal
  • Paint spot and silicone smear removal from glass and tiles
  • Sticker and protective film removal from windows and fittings
  • Fine dust removal from walls, ceilings, sockets and vents
  • Floor scrubbing, polishing and final buffing
  • Debris clearing and site handover finish

Two-stage cleaning for new builds

We work in stages: a rough clean to remove debris and heavy dust, then a detailed finish clean once trades are finished. Fine construction dust keeps settling for days, so the final pass is what gives a genuinely clean handover.

Protecting new finishes

New tiles, aluminium, glass and timber scratch easily. We match the method to each surface — correct pads, dilutions and tools — so cement and paint come off without damaging the finish you just paid for.

Developers, contractors and homeowners

We clean single apartments, whole blocks, offices and shops under renovation. For contractors we can phase the work unit by unit to match your handover schedule.

Frequently asked questions

How much does post construction cleaning cost?

It is quoted per site because dust and cement levels vary widely. Send photos on WhatsApp to 0706 630681 for a fast estimate.

How long does it take?

A single apartment usually takes one to two days depending on size and how much cement and paint must be removed.

Can you clean before the client handover date?

Yes. We plan around your programme and can work evenings or weekends to hit a handover date.

Do you remove construction debris?

We clear cleaning debris and light rubble. Bulk demolition waste removal can be arranged on request.